Trestle Bridge Demolition
Trestle Bridge Demolition (between Cheswick & Springdale) will begin tomorrow, 11/13/24 and is expected to last 5 days. Closure times are 9 pm to 6 am; detours will be posted. Emergency vehicles will be able to access the road if need be.
